
Boiler Inspections
Redline on standby for rescue for routine boiler inspections.
Basement Clean
Redline operatives cleaning and disinfecting underfloor void after soil pipe damage.

Confined Space Ventilation
Forced air ventilation using centrifugal fans prior to entry into water pipes.

Tank Relining Works
Rescue team and top man provision for contractors relining a storage reservoir.
Wet Well Rescue Team
Rescue back-up during crane and basket entry into 25m deep wet well.

Work Positioning
Lowering operatives into wet well to replace pump guide rails.
Service Shaft Entry
Full safety and rescue team for surveyors to enter deep service shalf and tunnel to assess for future works.

Asbestos Survey
Safety and rescue team for asbestos surveyors entering service tunnels beneath university.

Culvert Repair Works
Top man and rescue team for contractors carrying out culvert repairs.
Laser Scanning
Safety and rescue team for surveyors to laser scan basement areas prior to demolition works.

Top Man Provision
Top man and confined space safety equipment for surveyors carrying out line and level survey of culvert.

Remedial Seal Removal
Redline operatives removing remedial seals from pipelines prior to re-lining works.

Confined Space Supervision
Using bluetooth technology to keep an eye on atmospheric readings.

Bridge Movement Monitoring
Rescue and safety teams to facilitate maintenance of bridge monitoring equipment.

University Service Tunnel Maintenance
Safety and rescue team to supervise pipe lagging replacement in service tunnels.
Tank Welding
Rescue team to standby during welding activities within a series of tanks.
Tank Cleaning
Provision and operation of airline breathing equipment during tank cleaning in a hazardous atmosphere.

Drone Recovery
Provision of standby team to retrieve confined space inspection drone if required.

Gas Main Diversion
Confined space safety and rescue team for surveyors assessing for future works.

Penstock Inspection
Access and rescue team to facilitate routine inspection works.

Radiation Survey
Provision of rescue team and top man to enable radiation monitoring within underground chambers.

Powered Winches
Redline using one of their powered winches to lower inspectors into a service reservoir.

CCTV - Lateral Connections Survey
Safety escort teams looking after CCTV operatives investigating lateral connections.

Culvert Survey
Safety escort team looking after surveyors laser scanning culverted watercourse.

Confined Space Evacuation Drill
Training and facilitating emergency drills at the start of a tank re-lining project.

Deep Under River Tunnel
Full entry management (rescue, entry and supervision) during cleaning works.

Roped Access Entry
Using powered ascenders for access into culverted watercourse.

Reservoir Remedial Works
Rescue cover and entry management for multiple contractors working within underground storage reservoir..

Multilanding Shaft
Safety and rescue teams supervising surveying of services within tunnel and shafts.






















